Case Study: St Helens Hospital Redevelopment
Project
St Helens Hospital Redevelopment
Client
St Helens & Knowsley NHS Trust
Year
2008
Location
Lancashire, England
Task
-
The £338m project involved the construction of a new Diagnostic Treatment
Centre extending the hospital site over challenging ground conditions
-
A gas risk assessment concluded that levels of both carbon dioxide and methane gasses
were elevated on the site and that appropriate gas protection measures were required
-
The substructure required a passive gas venting system, allowing any gas emissions
to be dispersed away from under the building
-
Fosroc’s role in the project was to provide the gas protection membrane for
the suspended ground bearing slab, for which
Fosroc Proofex Engage was specified
Constructive Solution
-
Fosroc worked closely with Project Manager, Taylor Woodrow Construction, Consultants
Arup and Architects Capita to develop appropriate solutions from an early stage
-
Fosroc’s CAD Centre produced standard and bespoke details
-
Over 10,000m² of Fosroc Proofex
Engage waterproof and gas-resistant membrane was pre-applied to the ground
slab and lift pits. Fosroc Proofex
Engage created an ideal permanent layer of protection over the quarry areas
where ground settlement may continue
-
Pile heads in a contiguous pile wall were applied with
Fosroc Proofex WG, a high performance epoxy resin grout that mechanically
bonds with Fosroc Proofex Engage
to form a robust waterproof seal.
Fosroc Nitocote EP405 was used to continue the membrane through retaining
walls and columns at pile caps and lap with the
Fosroc Proofex Engage
-
Fosroc Proofex LM liquid membrane
was used for complex detailing work such as corner details and service entries
-
In addition, more than 1600m² of
Fosroc Proofex 3000MR methane resistant self-adhesive membrane was post-applied
to the vertical faces and used for detailing work around the perimeter of the building
-
To give further protection, Fosroc
Proofex Total loose-laid gas impervious membrane was applied across the
masonry wall cavity at the perimeter toe details
Value to Client
-
Fosroc’s products provided an integrated waterproofing and gas protection
solution
-
Design Manager, Clive Philips of Taylor Woodrow Construction said: “Fosroc
UK’s design services and support have been really helpful”
-
Fosroc UK’s contribution throughout and particularly during the design development
phase of the project was crucial and much appreciated

|